Story Point Estimates You Can Actually Trust
Stop guessing how long 13 story points will take.
Get time-based estimates with confidence ranges, calibrated to your team’s real velocity.
🚨 Sprint planning shouldn't feel like tarot reading.You're asked:
“Can we finish 25 story points by next Friday?”But story points aren’t time. And gut checks fail.You deserve estimates based on data — not stress.
🛠️ What It Does:→ Maps Fibonacci story points to real-time ranges
→ Calibrates to your team’s velocity
→ Adds confidence levels & buffer
→ Works even without Jira📊 Example Output:
“20 story points = 6.5 to 8.1 days (85% confidence)”
Built by a senior engineer frustrated with broken sprint planning.Have thoughts? Hit me below or at: [email protected]